Tullinge gymnasium

Location: Alfred Nobels allé 222-224

Customer: Boetten Bygg AB

Assembly start: September 2025

Assembly completed: November 2025

Size: Structual frame: 62 × 38 meters, ridge height:19 meters

New sports hall for tullinge gymnasium

CG Solutions is designing and delivering the structural frame for the new sports hall at Tullinge Gymnasium. The project uses many different construction systems, showing our versatility in prefabrication and installation.

We are working on elements such as:

  • Concrete railings – an unusual feature in our projects
  • Unpainted concrete elements in the stairs, highlighting the raw concrete surface
  • Steel columns and trusses
  • Glulam (glued laminated timber) columns
  • CLT stairs and spectator stands

The building’s façade will use Ruukki SPA 230 E Life Patina sandwich panels:

Interior: 0.5 mm white polyester-coated steel (RR20) – clean and bright interior

Exterior: 0.7 mm Cor-Ten® Patina steel – rust-resistant with a natural, aging look

Contacts

Andris Bondars

Projectledare

abo@carlgustav.se

CarlGustav Solutions AB

Pictures

View more projects

Ready to take your

project to the next level?