New F-6 school in Köping
CG Solutions delivered and installed the structural frame for the new Nyckelbergsskolan in Köping, designed for around 420 students and 30–40 staff. The project included a mixed structural frame with steel and timber columns and beams, roof trusses, concrete walls and stairs, as well as concrete hollow-core and solid slabs.
The new school will include a kitchen, workshops, and a sports hall. Groundworks and structural installation took place in spring 2026, with completion scheduled for spring 2027.
Image: Carlstedt Arkitekter
