Södermalms IP, Skövde
We have been part of the development of Södermalms IP, a new football arena built for elite-level competition, where we have engineered, delivered, and installed a grandstand structure.
Södermalms IP was originally built in 1922 and was due for renovation. The need for redevelopment was significant in order to meet future requirements.
The grandstand has been developed by us using the excellent combination of steel, concrete, and timber. The redevelopment ensures that the arena meets the requirements of the Swedish Football Association for play in the Superettan, and we are proud to have contributed to that.
The arena will be used for more than elite sports, including education, association meetings, and school activities.
We are grateful to have been part of this project and thank Byggdialog for their trust and a great collaboration. The images used on CG Solutions’s website were taken by Byggdialog.
Images: Byggdialog




